Making It Happen In Miami! banner

Making It Happen In Miami!

Pompano Beach, FL, US

65,000 SQ FT

Back to Portfolio

Services

Construction
Design and Engineering
Installation
Material Procurement
Project Management
  • 2-Level Rack-Supported Pick Module for high-volume efficiency
  • Selective Racking for oversized inventory
  • Very Narrow Aisle (VNA) design to maximize density and floor space
  • Saved the client over $500,000 by utilizing pre-owned components
  • Cut the build schedule by 2 months
For a new 65,000 SF distribution center, G&P partnered with Prologis Essentials to design and deliver a scalable storage solution for a leading automotive parts distributor. The system combined a 2-level rack-supported pick module, selective racking for oversized inventory, and a VNA layout to maximize efficiency and density. By leveraging high-quality pre-owned components and innovative re-engineering, G&P saved the client over $500,000, shortened the build schedule by two months, and ensured compliance with all local building and fire codes. The result: a future-ready, cost-effective storage system built to support growth and future automation.

Image Gallery

Gallery image 1