- Tearing down two rack supported pick modules
- Tearing down two mezzanines
- Removing the conveyor system
- Eliminating the CAT5/ low voltage wiring from ceilings and walls
- Returning the building to rent ready condition i.e. cleaning floors, repairing holes in drywall, and fixing damaged concrete floors