Reset In The Midwest banner

Reset In The Midwest

Canal Winchester, OH, US

440,000 SQ FT

Back to Portfolio

Services

Construction
Tear Down
White Box
Project Management
  • Cut, Cap, Remove All MHE Associated Electrical
  • Cut, Cap, Remove All MHE Associated Sprinklers
  • Code Out Obsolete Risers and Flow Switches from Alarm System
  • Remove Anchor Bolts or Cut Flush with Concrete Floor
  • Remove All Overhead Signage & Branding
  • Removal of Floor Mounted Conveyance System
  • Removal of All Mezzanine Structures
  • Removal of All Fencing
  • Removal of All Safety Guard Rail Systems
  • Removal of All IDF Cabinets and Networking Cabling
  • Removal of Air Compressor System and All Air Piping
  • Removal of All Floor Tape & Striping.
  • Facility Left in White Box Like Condition Ready to be Returned to Landlord
  • Remove Interior and Exterior Building Signage
G&P successfully completed the project for our client, by providing all labor, equipment, tools, and materials, led by a dedicated project manager who ensured seamless planning, scheduling, and communication throughout. All work was carried out in full compliance with OSHA standards, local permitting requirements, and proper licensing, insurance, and bonding. As part of the scope, G&P acquired and removed a wide range of facility assets not retained by the client, including pallet racking, conveyors, mezzanines, packaging equipment, and IT infrastructure. Key services included the safe disconnection and removal of electrical and sprinkler systems, demolition of mezzanines, guardrails, fencing, and conveyance systems, as well as the removal of cabling, compressors, signage, and anchor bolts. To maximize value, G&P left the facility in a pristine, white-box condition—clean, debris-free, and ready to be returned to the landlord. This project showcases our ability to deliver turnkey decommissioning solutions with efficiency, safety, and client satisfaction at the forefront.